Pre-move-out inspection no surprises at handover
During a pre-move-out inspection — in Dutch a "voorinspectie" — you walk through the property with the tenant well before the tenancy ends. You record what still needs to be repaired, cleaned or removed, so the tenant knows exactly what to expect.
Your first report is free. No credit card, no subscription.
What is a pre-move-out inspection?
The pre-move-out inspection usually takes place two to four weeks before the final handover. Landlord and tenant look at the property together and compare it with its condition at the start. Everything the tenant still needs to do is written down: filling holes in walls, removing their own installations, cleaning.
The advantage: the tenant still has time to sort things out themselves, and there is no discussion at handover. In Kamerinspectie you record the pre-move-out inspection as an interim inspection, compare it with the condition report and note agreements with photos.
- Compare each room with the condition report from the start
- Record repair points as damage or agreement, with a photo
- Note who takes action and who bears the costs
- Have the tenant sign the agreements digitally
One walkthrough, a smooth handover
With a good pre-move-out inspection the final handover takes minutes.
Compare with the start
Link the condition report and see how each room was at the start. That way you objectively establish what changed.
Clear repair points
Record for each point what needs to happen, who does it and roughly what it costs.
Photos as reference
Take a photo of every point. At handover you immediately see whether it was resolved.
Agreements signed
The tenant signs for the agreements. That prevents "we never agreed on that".
Note meter readings early
Record interim readings, so you quickly spot anomalies at handover.
Ready for handover
At the final inspection you create the move-out report and compare again. Everything is in one archive.
What to look for in a pre-move-out inspection
These points come up in almost every pre-move-out inspection.
- Holes in walls and ceilings from plugs or hooks
- Installations added by the tenant that need removing
- Carpets, laminate flooring and tiles
- Damage to doors, window frames and kitchen worktop
- Limescale and mould in bathroom and toilet
- Garden, balcony and storage room empty and tidy
- Heating, extractor fans and smoke detectors working
- Agreement on the date and time of the final handover
Frequently asked questions about pre-move-out inspections
Also useful to read
Property condition report
The starting condition you compare the pre-move-out inspection with.
View →Move-out inspection report
The final inspection when the keys are handed in.
View →Blog
Rental handover checklist
A practical checklist for handing over a rental property. Work through these points and you will not forget anything at the final inspection — from meter readings to keys and damage.
Read more →Go into handover well prepared
Create a free account and record the pre-move-out inspection. Your first report is free — no credit card or subscription.